An outdoor fireplace is built around one 1,800-degree event, and every part of the specification exists because of it.
A custom outdoor fireplace is published as wood-burning or gas, with gas fire pits as the smaller alternative. The published cost bands are clear about scale: the fireplace-specific band is 12,000 to 40,000 depending on size and stone, an installed outdoor fireplace as an add-on to an existing kitchen is 2,000 - 8,000, and the site-wide project band is 15,000 and 35,000, with 25,000 to 50,000 published for a custom build that includes a pergola, refrigeration, cabinetry, sink and an outdoor fireplace. The published payoff is social rather than financial: adding a fireplace is reported to increase outdoor-space use by roughly twice as much. Tampa Outdoor Kitchens is a free matching service, not a provider - we route your request to licensed local builders and we do not employ contractors.
| Job | Published 2026 range |
|---|---|
| Built-in gas grill, installed | 1,500 - 5,000 |
| Pizza oven, installed | 1,000 - 8,000 |
| Outdoor-rated refrigerator | 800 - 3,500 |
| Sink with plumbing | 300 - 2,000 |
| Gas line run from the meter | 400 - 2,000 |
| Low-voltage lighting package | 500 - 1,500 |
| Running gas, water and electric lines together | 2,000 - 5,000 |
| Underground line runs and trenching | 500 - 2,000 |
| Permit allowance | $75 - $400 |
| Removal or demolition, per unit | 25 - 60 |
The published specification is a built structure, not a fire pit with a chimney. A custom fireplace is wood-burning or gas, with a firebrick-lined firebox that withstands 1,800-degree temperatures, a steel reinforced concrete cap over the firebox, and a stone veneer or full-bed stone exterior that matches the outdoor kitchen it sits beside. A built-in seating wall typically completes the assembly.
Those three details - the firebrick lining, the reinforced cap and the mass of the surround - are what separate a fireplace that lasts from a decorative box that cracks. Masonry works by storing heat and releasing it slowly, which is why the structure is heavy and why the footing under it matters more than the finish on it.
| Component | Published specification | What it does |
|---|---|---|
| Firebox | Firebrick-lined, withstands 1,800-degree temperatures | Contains the fire without spalling the masonry |
| Cap | Steel reinforced concrete cap | Closes the top of the surround against weather |
| Exterior | Stone veneer or full-bed stone | Matches the outdoor kitchen and protects the mass |
| Seating | Built-in seating wall | Turns the fireplace into a room, not an object |
| Base | A 4-inch reinforced concrete slab on compacted gravel | Carries the weight of masonry and the firebox |
Gas fire features are the lighter path. A gas fire pit or gas fireplace still needs a gas line run from the meter, a permitted connection and clearance to combustibles, but it does not need the mass of a wood-burning chimney and it starts with a switch rather than a fire.
The fireplace band is the one item that is published separately from the rest of the project, because size and stone drive it more than anything else does.
| Scope | Published band |
|---|---|
| Outdoor fireplace, depending on size and stone | 12,000 to 40,000 |
| Installed outdoor fireplace as an add-on | 2,000 - 8,000 |
| Typical project range | 15,000 and 35,000 |
| Custom build with pergola, refrigeration, cabinetry, sink and outdoor fireplace | 25,000 to 50,000 |
| Counter run, stone veneer masonry with granite counter | $400-670/lf |
| Counter run, masonry block island with stucco finish | $250-450/lf |
The spread inside the 12,000 to 40,000 band is explained by the same published cost drivers as the rest of the niche: appliances, countertop material, and utility runs are the big-ticket items, and prices vary by 30 to 40 percent for the same layout based on appliance brands and stone selection. A fireplace quoted as full-bed stone against the same footprint framed in veneer over block is a different structure with a different footing, which is why the two quotes should not be compared line by line.
Where the fireplace is fed by gas, add the published gas line run from the meter at 400 - 2,000, and allow for underground line runs and trenching at 500 to 2,000 that many quotes leave out. Running gas, water and electric lines to a new outdoor zone is published at 2,000 to 5,000.
The published ventilation rule applies to every cooking and heat appliance in the zone: open-air builds need no mechanical ventilation, but covered or enclosed areas require a rated vent hood, because an under-counter appliance or an enclosed room without airflow traps smoke and heat, damaging finishes. A fireplace under a solid cover is exactly the case that rule is written for.
Gas appliances carry their own published requirement - proper ventilation for gas appliances and the code-required clearances - and the failure signals published for a gas line are specific: a gas smell, weak flame, or hissing at a fitting means the line needs attention immediately, and a licensed pro should pressure-test the line and confirm the system is safe before you cook. Stainless and weather-rated construction, sealed electrical connections, and covers rated for UV exposure are the published list for anything that lives outdoors.
Tampa Bay is humid-subtropical: the National Weather Service's Tampa Bay office covers a wet season running roughly June through September that supplies most of the year's rain, alongside summer heat indices that routinely pass 100F and year-round humidity that never really dries out. Layer an airborne-chloride film over everything within a few miles of the bay and the Gulf -- which is all seven of these towns -- and the specification is set by salt and moisture more than by heat. That drives three decisions: 316 (marine) stainless for every exposed metal surface including hinges, slides and fasteners, because the 2-3% molybdenum that grade 304 lacks is what resists chloride pitting in coastal air (the Australian Stainless Steel Development Association notes grade 316 is 'often chosen for more aggressive environments such as sea-front buildings and fittings on wharves and piers'); sealed marine-grade polymer boxes or a CMU/concrete core rather than standard 'outdoor' MDF or particleboard, which delaminates and swells in coastal humidity; and countertops that tolerate thermal shock and UV without an annual reseal. Rinsing metal with fresh water after salty spells and using breathable covers rather than non-breathing tarps extends the life of all three. shapes the rest of the specification. Materials published as holding up best in heat and humidity are powder-coated aluminum and stainless steel, along with stone or brick veneer for the structure, with pressure-treated or cedar frames working well when sealed properly. Around the footings, USDA-NRCS mapping puts the Tampa area on Myakka fine sand -- Florida's official state soil and the single most extensive map unit in Hillsborough County (164,000 acres) -- a very deep, very poorly to poorly drained Spodosol (sandy, siliceous, hyperthermic Aeric Alaquods) formed in sandy marine deposits. Its diagnostic feature is a spodic 'hardpan' Bh horizon typically 20-36 in. down, above which permeability is rapid; the seasonal water table sits within 18 in. of the surface for 1-4 months in most years and recedes past 40 in. only in very dry seasons. For anchoring a kitchen island that is the whole problem: footing depth is set by the fluctuating water table and the spodic layer, not by frost, so over-excavate below the organic A/E horizons (roughly the top 20 in.) and found on compacted select fill or a thickened, reinforced slab edge rather than a shallow surface pad, or the pad will move as the water table rises and falls. Much of the built-up area is now mapped as Urban land or Myakka/Urban land complexes, so pull the site-specific map unit for the actual address in NRCS Web Soil Survey before footings are set. Sources: NRCS Official Series Description, Myakka series (https://soilseries.sc.egov.usda.gov/OSD_Docs/M/MYAKKA.html); NRCS Web Soil Survey (https://websoilsurvey.nrcs.usda.gov/app/). and site drainage decide how the base is built: the slab should slope away from the structure, poor drainage leads to standing water, moss, and rusted appliance bases, and site drainage is one of the three things - weather patterns, soil characteristics, and building code requirements - that published guidance says to check before a design is finalized.
NRCS Soil Data Access point queries around Wesley Chapel return a mix of moderately well drained Tavares sand on the knolls and ridges and wetter soils (Newnan, Pomona, Sparr, even Zephyr muck) in the flats; Tavares is a Quartzipsamment with less than 5% silt plus clay from 10 to 40 in. and a seasonal water table 42-72 in. down for most of the year (https://soilseries.sc.egov.usda.gov/OSD_Docs/T/TAVARES.html). On uniform sand with no shallow clay layer, an island footing holds best widened and set into compacted sand below the A horizon.
Wesley Chapel is unincorporated Pasco County and gets its water from Pasco County Utilities, whose Central Pasco customer service office is at 19420 Central Boulevard in Land O' Lakes (813-235-6012). Pasco County is one of the member governments of the regional Tampa Bay Water system, which supplies it finished water blended from Floridan Aquifer groundwater, surface water drawn from the Alafia and Hillsborough rivers and the C.W. Bill Young Regional Reservoir, and desalinated seawater; the county's own wellfields also draw on the Floridan Aquifer. Tampa Bay Water reports that in 2024 the water it provided to its member governments met or was better than all state and federal drinking-water health standards. Sources: https://www.pascocountyfl.gov/services/utilities/about ; https://www.tampabaywater.org/wp-content/uploads/2024-Water-Quality-Report-1.pdf
Utility accounts: Pasco County Utilities · (813) 235-6012
The fireplace-specific published band is 12,000 to 40,000 depending on size and stone. Added to an existing outdoor kitchen, an installed outdoor fireplace is published at 2,000 - 8,000. For context, the typical project range is 15,000 and 35,000, and a custom build with a pergola, refrigeration, cabinetry, sink and outdoor fireplace is published at 25,000 to 50,000. A gas feed adds a published line run from the meter at 400 - 2,000.
Both are published options, and the trade-off is in the specification. Wood-burning requires a spark screen and a code-compliant chimney height, and the local position on wood-burning with a proper spark arrestor should be confirmed with Two different offices, decided by the parcel, not the mailing city. Inside Tampa city limits, residential building, structural and gas permits for an outdoor kitchen are issued by the City of Tampa Construction Services Division (part of the Development & Growth Management Department), which reviews plans, issues permits and performs inspections; applications run through the city's Accela Citizen Access portal (https://aca-prod.accela.com/Tampa/Welcome.aspx). For unincorporated Hillsborough County -- which is where Brandon, Riverview and Lutz sit -- permits come from Hillsborough County Development Services, the customer service centre for planning, zoning, development review and building inspection, at County Center, 601 E. Kennedy Blvd. (16th Floor), Tampa; since January 2021 every application, plan upload and inspection runs through the county's HillsGovHub portal. Sources: https://www.tampa.gov/construction-services ; https://hcfl.gov/departments/development. Gas needs a permitted line run from the meter by a licensed plumber, sized to the total BTU of every appliance, with the code-required clearances. Either way the firebox stays firebrick-lined and rated for 1,800-degree temperatures.
A covered structure or any gas, electrical or plumbing work usually requires one - a gas line is published as requiring a permit and a licensed plumber, and anything over 12 ft tall usually triggers a permit as well. Published permit costs run 100-500 through the building department, with a calculator allowance of 75 - 400; the two published figures disagree, so confirm which applies to your scope.